Jump menu

Main content |  back to top

Notification of Unplanned Unavailability

Please be advised that the flow to the Gassled Transportation system from Nyhamna has been reduced due to an unplanned outage:

Planned Availability
Event ID Message Type Facility Time Published Time of Event Expected End Actual End Volume impact mcm/day
06.09.2015 Revision 1 Nyhamna 13:40 11:53 18:00    15 
17052015_03
Final
Nyhamna
22:00
    18.05.2015 17:00
28.5
27.01.2015 rev 0 Production shutdown Nyhamna 14:00 13:00 27.01.2015 22:00   10
27.01.2015_01 New Nyhamna

14:00

27.01.2015

13:00

27.01.2015

22:00

27.01.2015

  10
27.01.2015_01 Revisjon 1 Nyhamna

02:45

28.01.2015

13:00

27.01.2015

03:15

28.01.2015

  15
27.01.2015_01 Final        

28.01.2015

21:30

43
30.01.2015rev1 Production shutdown at Nyhamna 30.01.2015 at 16.30 hrs. due to black out and loss of power supply to Emergency Valves on Sleipner.
We have stopped all producing wells, two export compressors are running and both gas trains are circulating to hold HC/water dew point
Nyhamna 16:38 16:38 Unknown   30
31012015_02

Final

Back to full production at 09:40

Nyhamna 09:40 09:40     Total loss of gas production 16mcm/d
07022015_01 New Nyhamna 13:25 13:25 080215
01:25
  10
07022015_01 Revision 1 Nyhamna 13:25 13:25 070215
18:00
  4
07022015_01 Final Nyhamna 13:25 13:25   17:25 0
17052015_01 New Nyhamna 22:14
17.05.2015
21:14
17.05.2015
06:00
18.05.2015
  15
17052015_02 Revisjon 01 Nyhamna 02:00
17.05.2015
21:14
17.05.2015
12:00
18.05.2015
  30
20.03.2016_01
Production shutdown due to power failure
Nyhamna  16:26 16:15 20.03.2016
23:00
  20
20.03.2016_01
Revision 1 Nyhamna  23:15
16:15 20.03.2016
23:00
  35
20.03.2016_01
Final
Nyhamna       09:30 16
26.06.2016_01
New Nyhamna 0630
27.06.2016
19:45
26.06.2016
07:00
27:06.2016
  7
  Final         06:30
27.06.2016
 

The information given is in good faith to the best of our knowledge at the time of posting, but no warranty is given as to its accuracy or completeness.

Notification of Planned Unavailability

Please be advised that the flow to the Gassled Transportation system from Nyhamna will be reduced for planned maintenance:

Planned Availability
Event ID Message Type Facility Time Published Time of Event Expected End Actual End Volume impact mcm/day
               

The information given is in good faith to the best of our knowledge at the time of posting, but no warranty is given as to its accuracy or completeness.